King County rivers requires that the Department of Natural Resources and Parks keeps a list of projects where large wood will likely found in a county river or stream. This list is updated and two public meetings are held annually to share information and discuss projects. Sign up to receive notifications of project updates and public meetings above.
For each project, the project manager will develop the following information for use in the public outreach process:
- Brief project description, including approximate type and amounts of wood expected to be used;
- Location of project;
- Primary purpose of the project and its relative importance to the success of County programs and mandates;
- Project goals and objectives;
- Existing project site conditions;
- Type, intensity and seasonality of recreational uses, if known;
- Intended function of the wood, including identification of how wood meets project goals and objectives;
- Project status and timing of conceptual design input opportunities; and
- Timing of planned and completed project construction.
Related information
Known hazards on King County rivers
Bank stabilization and levee setback projects
The value of riparian vegetation
Related agencies
Department of Natural Resources and Parks
Water and Land Resources Division
Projects in progress
Chinook Wind Mitigation Project
Fall City Floodplain Restoration Project
Cedar River Trail 5B Repair Project
Herzman to Camp Freeman Project
Irwin Right Bank Revetment Repair Project
Lones Levee Setback and Floodplain Restoration Project
Paradise Valley, Judd Creek Habitat Enhancement, Phase 2
Riverbend Levee Setback and Floodplain Restoration
Projects completed
Mitigation for hazard log repositioning, May 2014
Bear Creek – Doyle Property Restoration
Belmondo Revetment Enhancement Project
Cedar Rapids ELJ 6 Maintenance Repair
Clough Creek Off-Channel Sediment Facility
Elliott Bridge Reach Off-Channel Habitat and Floodplain Reconnection Project Phase 2
Fenster Log Placement, Green River Natural Area
Fenster Log Placement Mitigation, Fenster Park
Foster Golf Course Instream Log Placement Mitigation Site
Harris Creek Fish Passage Restoration
Issaquah Creek Mitigation Project
Klapp Property Habitat Restoration Project
Judd Creek Estuary Enhancement
Long Marsh Creek Drainage Improvement
Lower Tolt River 2018 Adaptive Management Plan
May Creek Drainage Improvement
McElhoe Pearson Restoration Project
Middle Boise - Evans Habitat Restoration Project
Middle Boise Creek Van Wieringen Restoration
Mouth to Bridge Right Bank Levee Repair
Porter Reach Restoration Project
Rainbow Bend Levee Removal and Floodplain Reconnection
Reddington Levee Setback and Extension
Reinig Road Revetment 2020 Project
Remlinger Revetment 2018 Repair
Scott Property, Judd Creek Habitat Enhancement Small Habitat Restoration Project
SE 19th Way Road Protection Revetment Repair Project
Shake Mill Left Bank Revetment Repair Project
Shake Mill Right Bank 2020 Repair
Singer Judd Creek Pond Enhancement
Sinnema Quaale Upper Revetment analysis and repair project
Stossel Bridge Right Bank Repair
Stossel Bridge Right Bank 2019 Repair
Stuck River Drive Revetment Repair
Tate Creek Drainage Improvement
Taylor Creek Mitigation Project
Teufel Nursery - Green River Corridor Mitigation Site
Timberlane 2019 Revetment Repair
Tolt Pipeline Protection Project
Upper Carlson Floodplain Restoration Project
For more information about projects with large wood installations, please contact Laird O'Rollins, ecologist, WLR Ecological Services and Engineering Services Unit.