Skip to main content
close

KingCounty.gov is an official government website. Here's how you knowexpand_moreexpand_less

account_balance

Official government websites use .gov

Website addresses ending in .gov belong to official government organizations in the United States.

lock

Secure .gov websites use HTTPS

A lock lock or https:// means you've safely connected to the .gov website. Only share sensitive information on official, secure websites.

Eastside Interceptor

Eastside Interceptor (Section 13) Lining Project

Completed October 2016

Project description

In early 2016, work began a section of the Eastside Interceptor (ESI) in Bellevue. The ESI sewer line that carries wastewater from homes and businesses in Bellevue, Kirkland, Redmond, Issaquah, and the Sammamish Plateau to the South Treatment Plant in Renton. Work included:

  • Installing pipe lining along approximately 1,360 feet of the 72-inch diameter pipe
  • Excavation at three locations to allow access to the pipeline
  • Installing erosion control, supports, dewatering wells and monitoring equipment
  • Restoring areas disturbed by construction

This work is part of a program to restore corroded sewer lines throughout the regional wastewater system. Pipe lining is a cost-effective way of maintaining the sewer lines. It saves on materials and energy use, when compared to installing new sewer lines.

project area map
expand_less